In the field of industrial production, the installation of industrial robots is extremely important. If there is a problem in the installation, it will not only affect the performance of the robot equipment, but also reduce the service life of the industrial robots, affect the safety of industrial production, and damage the economic benefits of enterprises. Therefore, it is very important to do a good job in the installation of industrial robots. Combined with previous work experience, We must do a good job in the following three aspects.
1. Understanding the program
Before the actual installation, the relevant personnel should have a detailed understanding of the working procedures of industrial robots, clarify the relationship between the components of industrial robots, which devices should be the same size and position, and which can be appropriately relaxed. In addition, the installation drawings shall be analyzed in detail, the working principle and functional structure of the industrial robot shall be mastered, and appropriate tools and equipment shall be found before installation, so as to better guarantee the installation effect.
2. Formulate a plan
In combination with the actual production situation on site, a detailed plan should be formulated for the installation of each industrial robot, and relevant emergency plans should also be formulated to ensure that everything is complete and that the target is targeted. In addition, before the actual installation, relevant operation instructions should also be formulated, in which specific operation procedures, operation points, required personnel and self inspection requirements should be specified, so as to provide a unified basis for the safety of industrial robot equipment. At the same time, the operation instructions are in duplicate. For example, the production company, the supervision department, the installation and commissioning department, and the on-site installation department should keep one copy respectively. In this way, if there are related problems in the future, they can be held accountable to avoid mutual wrangling.
3. Cognitive execution
It mainly means that every time an industrial robot is installed, a detailed review is required. For example, when the connecting equipment of the industrial robot is installed, a detailed review of the key dimensions of the installed parts is required, which can avoid the problem of overall rework due to size changes.
After all the industrial robots are installed, a comprehensive self inspection should also be carried out. Problems should be found and solved in a timely manner as far as possible before the later debugging, so as to reach the high standard of one-time qualification for installation acceptance, so as to provide guarantee for the installation progress of industrial robots and equipment, and ensure that the installation of industrial robots can be completed within the specified construction period.